§ 14 (3) Burgenland Building Act, as amended.
Land subdivisions
Subdivisions of already developed building plots in building land must be reported to the authority by the building applicant or landowner before being carried out in the land register. Documents to be submitted: application, subdivision plan by an authorised surveyor, declaration of consent from the landowners concerned.
§ 16 Burgenland Building Act, as amended.
Minor building projects
Minor measures for maintenance, repair or improvement that do not significantly affect building-police interests. (e.g. swimming pools up to 50 m² (depth ≤ 1.8 m), free-standing structures up to 20 m², fences up to 1 m solid or 2 m lightweight construction, subsequent thermal insulation, window replacement). Documents to be submitted: application, description of the measure, sketch/plan so that the project can be clearly defined.
However, it is at the discretion of the building authority whether building-police interests are significantly affected and whether a procedure under § 16 or § 17 must be carried out (even in the examples mentioned above).
§ 17 Burgenland Building Act 1997, as amended.
Approval procedure
For all projects that cannot be classified as minor, a building permit is required before construction begins. (e.g. new construction of a house, extensions and conversions, changes of use). Your authorised plan author supports you in preparing the submission documents in compliance with the law. Documents to be submitted: application, construction description, building plans, land register extract, list of neighbours from the BEV, AGWR data sheet, energy certificate, noise calculation (heat pump/air conditioning), as well as further documents as needed and required.
§ 18 Burgenland Building Act 1997, as amended.
Oral building hearing
If not all declarations of consent from the parties are available, or if other reasons affecting building-police interests exist, the building authority must hold an oral hearing. All parties will be invited by written summons.
§ 20 Burgenland Building Act 1997, as amended.
Demolition of buildings
The demolition of buildings can be submitted in connection with a new construction or as a separate building measure. For minor demolition projects (e.g. garden shed), in addition to the application, a plan drawing, a demolition description, and the signatures of owners within a radius of 2 m must be submitted. For the demolition of buildings (e.g. single-family house), §§ 17 and 18 apply accordingly.
§ 23a Burgenland Building Act 1997, as amended.
Lawful existing status
For existing structures without a valid building permit that were built before January 1, 1970, or for minor alterations to them up to January 31, 1998, no approval procedure under § 17 needs to be carried out. In this case, an application can be submitted, together with a newly prepared as-built plan and proof of the time of construction, to request a determination of lawful existing status.
§ 27 Burgenland Building Act 1997, as amended.
Completion notice, final inspection
The building applicant must notify the authority of the completion of a structure or building. The findings and confirmations prescribed in the decision must be enclosed with the application.
The building may not be used before a positive, complete final inspection report has been issued. The building applicant is administratively liable for compliance with this requirement.