Wastewater and sewerage

    In Parndorf, wastewater is channeled through a combined system in the older parts of town and a modern separate system in the newer residential areas. The entire network is integrated into the Abwasserverband Grossraum Bruck/Leitha und Neusiedl am See, which ensures effective treatment.

    An overview of the key components and special features of the sewer system:

    1. Combined System (Older Part of Town)

    • Function: In the older areas of Parndorf (such as on Hauptstraße), domestic wastewater and rainwater flow together in a single sewer.

    • Challenge: Since most of the infrastructure here dates back to the 1960s, there is a recurring need for renovation. The municipality has been working for years on gradual renewal to fix damage (such as cave-ins along the road).


    2. Separate System (Newer Residential Areas)

    • Function: In newly developed building areas (e.g. in the Anger area or near Maria-Theresia-Park), the sewer system was built as a separate system.

    • Separation: Here there are two separate pipelines. One channels the wastewater directly to the treatment plant, while the clean rainwater is separately directed into infiltration systems or bodies of water (such as the large pond by the sports field).

    • Challenge: Here too, very high groundwater levels can cause backups or problems with insufficiently documented drainage systems, which is why the network is continuously inspected by camera and optimized. The entire system has also been undergoing a comprehensive renovation since 2024.


    3. Wastewater Association

    Parndorf does not operate its sewer system completely on its own, but is part of the Abwasserverband Grossraum Bruck/Leitha und Neusiedl am See https://www.avbn.at/. This association organizes the wastewater treatment plants and the supply lines to them across municipal boundaries, in order to meet the high technical requirements of wastewater disposal. The local network falls under the responsibility of the municipality.